With a facility that operates 24/7/355, it is difficult to be able to do PdM on the power infrastructure's source cabling and distribution cabling for the 13.8KV and 2.3KV systems.
What are people doing to cover this, especially when organizations such as Global Risk Consultants mandate it be done on a regular frequency?
------------------------------
David Koenig
Reliability Manager
Pactiv Evergreen
Pine Bluff AR
------------------------------